At Qadri Group, we take pride in delivering complete, end-to-end engineering projects, transforming customer requirements, samples, and technical drawings into fully developed, tailor-made solutions. From reverse engineering and design to complete manufacturing, assembly, installation, and commissioning, we offer comprehensive project execution under one roof. Whether it involves developing a single component or delivering a complete engineering solution, our team works closely with customers to ensure every project meets their specific requirements. With our expertise, advanced machining capabilities, and commitment to quality, we turn complex engineering challenges into practical, reliable solutions.

← All sectors

Manufacturing of JTT Plug for CERN

Another feather in our cap was added when we delivered JTT Plug for CERN, Switzerland. CERN ('Conseil Européen pour la Recherche Nucléaire' or European Organization for Nuclear Research) is one of the world's largest and most respected centres for scientific research and operates the largest particle physics laboratory in the world.

Qadbros performed casting and machining of open grain cast iron under supervision by CERN, Switzerland. Casting and machining in compliance with defined standards was done and pre-delivery inspection was performed by the CERN Team.

Manufacturing of Shielding Components for CERN

Another notable addition to our portfolio was the successful manufacture of selected components for the TAXN assembly at CERN, Switzerland. The scope included the Top Shielding and TAXS Cradle, produced to meet CERN’s specified dimensional, geometrical, and material requirements.

Qadbros carried out the casting, precision machining, surface preparation, and quality inspection of the supplied components. The manufacturing process was executed in accordance with the defined technical requirements, with dimensional and quality checks completed prior to delivery for integration into the larger TAXN assembly.

Top Shielding

  • Robust shielding component manufactured for precise integration within the TAXN assembly
  • Precision-machined surfaces to meet specified dimensional and geometrical requirements
  • Heavy-duty construction for reliable performance in demanding environments
  • Surface-finished and quality-checked prior to final assembly

TAXS Cradle

  • Precision-manufactured support structure for secure positioning within the TAXN assembly
  • Comprises accurately matched upper and lower sections
  • Precision-machined for proper fitment, alignment, and assembly
  • Manufactured with controlled dimensional tolerances for dependable service

Mangla Dam Upgradation Project (under supervision of General Electric - G.E)

Qadbros is proud to be a partner of G.E in the Mangla Dam upgradation project wherein capacity enhancement of each turbine, from 100 MW to 135 MW, is being undertaken.

Some of the works performed by Qadbros include casting of MIV Bearing Carrier, refurbishment of 100 MW Turbine Housings, Outer & Inner Head Covers, Bearings, Irrigation Valve Body & Sleeve, Generator Thrust Pad, Operating Ring & Slip Ring & Exciter Shaft. Major scope covered includes:

  • Casting of parts as per required quality standards including Radiographic Testing
  • Ultrasonic and Magnetic Particle Testing for Identification of defects
  • Weld repairing of defects in compliance to referred standards
  • Machining to achieve original dimensions

Gating System for Guddu Barrage

  • Undertaken in partnership with Descon Engineering
  • Drawing generation, manufacturing and assembly of Canal Gates Hoisting Machines
  • In-house Factory Acceptance Test (FAT), UT, DPT, Dimensional, Mechanical and Load Test

Vacuum Reaction Drum

Qadri Group successfully completed the end-to-end execution of a Vacuum Reaction Drum project at Sitara Chemical Industries’ Bleaching Plant.

The complete scope included:

  • Dismantling of the existing drum and all associated accessories by our team.
  • Detailed inspection and reverse engineering wherever required.
  • Manufacturing of the new Vacuum Reaction Drum while maintaining critical dimensions and specifications.
  • Refurbishment of the internal shaft with precise restoration of all critical sizes.
  • Pressure and leakage testing to confirm equipment integrity.
  • Installation and alignment of the new drum with complete accessories.
  • Commissioning with verification of levelling, vacuum, pressure, temperature, and other critical operating parameters.

Commissioning with verification of equipment levelling, pressure, temperature, vacuum conditions, and other critical operating parameters.

Despite the project’s technical and execution challenges, the complete scope was successfully delivered while ensuring dimensional accuracy, operational reliability, and safe plant performance.